АШИГТ МАЛТМАЛЫН БАЯЖУУЛАЛТЫН ТЕХНИК, ТЕХНОЛОГИ

Ашигт малтмалын баяжуулалтын чиглэлээр сурч буй оюутан сурагчид, залуу инженерүүдэд зориулав.

Thursday, September 15, 2011

Уулын баяжуулах үйлдвэрийн Банкны ТЭЗҮ-ийн стандарт загвар



Section 1 – Executive Summary
1.1             Synopsis, Conclusions and Recommendations
1.2             Project Description
1.3             Financial Analysis
1.4             Geology, Mineralization and Ore Reserves
1.5             Mine Plan
1.6             Process Plant
1.7             Tailing Disposal
1.8             Infrastructure
1.9             Environmental Impacts and Mitigation Measures
1.10         Design for Closure
1.11         Capital Cost and Construction Schedule
1.12         Operating Cost
Section 2 – Introduction and Terms of Reference
            2.1       Introduction
            2.2       Study Objectives
            2.3       Study Execution
Section 3 – Financial Analysis
            3.1       Introduction
            3.2       Data and Assumptions
            3.3       Results
Section 4 – Geology, Mineralisation and Ore Reserves
1.1             Regional Geological Settings
1.2             Geology and Mineralization of the Property
1.3             Ore Reserves and Ore Types
1.4             Assay Quality Analysis
1.5             Potential for Reserve Expansion
Section 5 – Mining
5.1       Introduction
5.2       Design Criteria
5.3       Mine Design
5.4       Ore Reserve Statement
5.5       Mine Operations
5.6       Overburden and Waste Handling
5.7       Environmental Impacts of Mining
Section 6 – Site Selection, Access Routes and Ore Haulage
6.1       Introduction
6.2       Plant Site Layout
6.3       Site Access
Section 7 – Processing Plant
7.1       Introduction
7.2       Metallurgical Test Programs and Results
7.3       Process Plant Design Criteria
7.4       Flow Sheets and Plant Design
7.5       Process Control
Section 8 – Tailings Disposal
8.1       Introduction
8.2       Design Objectives and Assumptions
8.3       Summary of Laboratory Tests on Tailings
8.4       General Layout and Staged Development
8.5       Storage Capacity
8.6       Deposition Strategy
8.7       Tailings Pipework
8.8       Process Water Management System
8.9       Instrumentation
Section 9 – Water Management
9.1       Requirements and Sources
9.2       Process, Tailings and Reclaim Systems
9.3       Mine and Waste Dump
9.4       Potable Supply and Sanitary Disposal
9.5       Surface Runoff
9.6       Environmental Reporting
Section 10 – Ancillary Facilities and Services
10.1    Process Buildings
10.2    Ancillary Facilities
10.3    Refuse Disposal and Sewage Treatment
10.4    Fresh Water Supply
10.5    Fuel Storage
10.6    Administrative Offices
10.7    Warehousing
10.8    Security
Section 11 – Power Supply and Distribution
11.1    Overview and Power Requirements
11.2    Power Supply
11.3    General Design Parameters
11.4    Component Design Details
11.5    Electrical Distribution
Section 12 – Communications and Infrastructure
12.1    Telecommunications
12.2    Transportation
12.4    Housing
Section 13 – Socioeconomic Impact and Human Resources
13.1    Socioeconomic Considerations
13.2    Manpower Training Plan
13.3    Technology Transfer
13.4    Community Impacts
Section 14 - Environmental
14.1    General
14.2    Permitting Process
14.3    Status of Permits
14.4    Environmental and Health Legislation
Section 15 – Design for Closure
15.1    Mine and Waste Stockpile Areas
15.2    Plant Site and Infrastructure
15.3    Tailings
15.4    Water Quality
15.5    Post-Closure Monitoring
Section 16 – Construction Plan
16.1    General
16.2    Access and Haul Roads
16.3    Processing Plant
16.4    Tailings Storage
16.5    Power Supply
16.6    Environmental Impacts of Construction
16.7    Schedule
Section 17 – Capital Cost
17.1    Summary
17.2    Scope
17.3    Basis of Estimate
17.4    Assumptions
17.5    Exclusions
Section 18 – Operating Cost
18.1    Summary
18.2    Mine
18.3    Processing Plant
18.4    Tailings Storage Facility
18.5    Plant and Administration
18.6    Environmental Monitoring and Closure
Section 19 – Closure Cost
19.1    Summary
19.2    Human Resources
19.3    Mine and Waste Stockpiles
19.4    Processing Plant
19.5    Tailings
19.6    Post-Closure Monitoring
Section 20 – Marketing
20.1    Industry Structure
20.2    Historical and Projected Supply / Demand Relationship
20.3    Demand, Supply and Pricing Trends
20.4    Competition
20.5    Marketing Contracts
20.6    Project Advantages
Section 21 – Rights, Ownership and Legal Matters
21.1    Property Ownership
21.2    Mining Claims
21.3    Surface Rights
21.4    Water Rights
21.5    Permit Requirements
21.6    Taxation
Appendices
            Appendix 1     Income Taxes and Royalties
            Appendix 2     Cash Flows

No comments:

Post a Comment